The summer rainstorm hits, and the home is waterproof: Bluestar Gangyu elastic waterproof coating solves your worries


Every summer, heavy rains come one after another, bringing a touch of coolness to people, but also bringing new problems to home decoration: if the waterproofing of home decoration is not properly handled, it will cause water leakage, accumulation of water, and moldy walls on the roof, exterior walls, kitchen and bathroom. Such situations will not only bring economic losses to their own families, but also greatly affect people's mood to escape the summer. Home improvement waterproofing is one of the important aspects of decoration, and its quality directly affects the "flood" problem after moving in. Therefore, I recommend a product for you here: Bluestar Gangyu elastic waterproof coating, which will make your life worry-free.

4135323

Bluestar corundum elastic waterproof coating is a high polymer two-component cement-based elastic waterproof coating modified by biologically active substances. The powder is mixed with the composite liquid, chemical reaction and biological activity reaction occur, and it can penetrate into the microcapsules of concrete. Holes and gaps form a tight and firm permanent combination and become a tough elastic waterproof membrane, which has a unique effect on the waterproofing of indoor and outdoor buildings such as roofs, exterior walls, kitchen and bathroom.

The following is the detailed construction process of elastic waterproof coating:

1. Before construction

4321313

Before the construction of the elastic waterproof coating, it is necessary to ensure that the base layer is clean, smooth, firm, free from sand, powder, dust, oil, shedding and other debris, and sharp protrusions should be shoveled off. Before construction in dry and high temperature weather, wet the base surface with water to no clear water.

2. Remove the protrusions

432123

Carefully inspect the base before construction. The base must be firm, clean, and free of clear water on the base. Sharp bulges must be removed to ensure that the base is flat.

3.preparations

432131

1 Before stirring the elastic waterproof coating, the mixing bucket should be cleaned in advance (it is best to use the original elastic waterproof coating bucket), and there should be no other glue, paint and any pollutants in the bucket, so as to avoid chemical reaction or mixing of various impurities to affect the construction. effect and product quality.

2 Construction tools such as portable mixers, scrapers, brushes, mud palms, etc. should also be prepared on site. When the preparation is complete, pour the component A (composite liquid) into the mixing tank first.

4. Mixing process of elastic waterproof coating

4341321

1 Before stirring the elastic waterproof coating, the mixing bucket should be cleaned in advance (it is better to use the original elastic waterproof coating bucket), and there should be no other glue, paint and any pollutants in the bucket, so as to avoid chemical reaction or mixing of various impurities to affect the construction effect and product quality.

2 Construction tools such as portable mixers, scrapers, brushes, mud palms, etc. should also be prepared on site. When the preparation is complete, pour the component A (composite liquid) into the mixing tank first.

Four mixing process of elastic waterproof coating

1. Pour all the component A (composite liquid) into the mixing bucket, and then squeeze all the remaining compound liquid in the bag into the mixing bucket. Be careful not to throw the compound liquid at will.

2. The amount of water added is 5% of component A (composite liquid). Adding too much water will seriously affect the product quality and curing time.

3 3 5% water should not be poured directly into the mixing tank, but should be poured into the inner film bag containing the component A (composite liquid), which is used to wash the residual compound liquid in the bag, and poured into the mixing tank together.

4. Mix the component A (composite liquid) with a small amount of water in the mixing tank with a hand-held mixer.

5 Then slowly pour component B (powder) into the liquid, stirring while pouring.

6 After the initial stirring, use the scraper to scrape off the unstirred material at the bottom of the barrel and the side of the barrel, and then fully stir until it is a paste without particles and precipitation, and the stirring time is about 5-10 minutes.

5. Use immediately after mixing

531231

After the elastic waterproof coating is evenly stirred, it cannot be left standing in the air for a long time and must be used up within one hour. For walls exposed to direct sunlight or particularly dry, wet the base layer with water before construction. Use the gap, you can use the film cover to seal on the barrel mouth, to avoid the surface drying and filming.

Six batches of scratching

1 Primer: In order to achieve the best effect, it is best to use the mud palm batch scraping method, and it is necessary to scrape a thin layer first. Construction should be stopped in case of rain.

2 Repeated rolling and flattening: Repeat rolling during priming to make the elastic waterproof coating fully penetrate and contact the base layer. Immediately after priming, the first batch should be scraped to avoid missing scraping. Pay attention to smoothing the surface while scraping.

412315
 

Seven, continue to scrape on the dry coating film

5435232123

After scraping one layer, you must wait for it to be completely cured and dry before making the second layer. Generally, 2-3 layers are scraped, and the final thickness after completion of construction should not be less than 2mm (the thinnest part). It should continue to be scraped to the thickness, and the scraping direction of each layer is preferably perpendicular to each other.

Eight maintenance periods

5321313

The last pass should smooth the surface of the coating film. Within 3-4 days after construction, protective measures should be taken, people should not walk or touch it, do not get exposed to rain and sun, and avoid freezing, and the curing period should not be less than 15 days.

Nine. Painting and construction

4321324

In places that cannot be scraped, the brushing method can be used for construction. When stirring and brushing materials, more water should be added than the materials used in batch scraping construction, but the excess amount should not exceed 5%. The rest of the method is the same as the batch scraping construction.

Ten Clean tools in time

4312313

After mixing or construction, the used mixer, mixing bucket, mud palm, brush and other construction tools must be washed with water in time to avoid sticking.

*※Tips

5321345

1. Construction of joints between boards: The elastic waterproof coating can also be applied to the joints between boards such as wood laminates to fill the gaps between the boards, which can effectively prevent the expansion, deformation and cracking of the joints of the wood laminates.
2. Full batch construction on the board: full batch construction on the board or wood laminate, and seal the board to prevent the board from being deformed and discolored by moisture.


Prev: The choice of home improvement waterproof coating is exquisite

Next: The new waterproof coating will set off another round of market storm

Related news


Waterproofing works should not be ignored

Home improvement waterproofing is an important hidden project. Once it leaks, the furniture and walls will become moldy, and the decoration will be damaged, and the neighbors will lose peace, and the loss will easily cost tens of thousands. To avoid the problem of moisture and leakage, it is necessary to understand the misunderstanding of waterproofing and supervise the quality of the product, so as to ensure that there is no "wet".


Why do you need to brush the interface agent before scraping the putty?

Loose walls, loose base layers that are not completely removed, floating ash on the surface, and alkali salting out are all reasons for the hollowing and falling of the wall. General interface agents on the market can solve the problem of not removing the floating ash. The fully functional Bluestar corundum interface agent can solve all the above problems.


How to solve the problem of moldy and long hair on the wall after decoration

First, the water supply pipe or heating pipe leaks, causing the wall to be damp. The second is that the roof or outer wall is not waterproof or the waterproof quality is poor, and rainwater seeps into the wall or indoors. The third is that the windows, kitchen and bathroom are not well waterproofed, resulting in water penetration.


Market Prospects of Multifunctional Waterproof Coatings

With the development of science and technology, in the future bridge construction, film-covered and crystalline-permeable inorganic waterproof coatings will be more and more applied. Waterproof technology has been applied in engineering.


After the decoration is finished, the wall is moldy and hairy, Chengdu putty: Bluestar Gangyu will help you

Mildew is caused by bacteria and mildew, which manifests as black, brown and other irregular markings on the wall; long hair is caused by soluble salt and alkali in the wall after dissolving and migrating to the wall to recrystallize, which is called pan-alkali or salt. Analysis, manifested as yellowing, white powder or hair on the wall.


The choice of home improvement waterproof coating is exquisite

In modern home decoration, waterproofing is an important part. In general, bathrooms, kitchens, and bathrooms should have waterproof layers. However, many families have no clear concept of how to choose a qualified waterproof coating.