[Summary]1. Due to the wide application of glue-free gypsum on the market, there are the following hidden dangers
1.1 This type of product has poor leveling ability in full batches. The wall after glue-free gypsum treatment needs to be filled with thicker or even extra-thick putty during construction, which exceeds that of the putty paste, which is less than 0.5mm per batch, and the total thickness is less than 2mm. requirements (see each product manual).
1.2 This type of product solidifies quickly, but it is not easy to dry. Often, the glue-free gypsum used for wall construction is solidified but not completely dry, and the workers will scrape the putty paste, causing the putty paste to be scraped on the wall or scraped and turned over.
1.3 Even if the glue-free gypsum has dried up, due to its extremely poor water resistance, it is not easy to dry after absorbing water. During the construction of the putty paste, the glue-free gypsum absorbs a large amount of water in the putty paste and returns to a water-retaining, moist and soft state. The surface is subjected to external force by scraping. Friction damage, causing the putty paste to be unable to apply to the wall or scrape the skin.
1.4 Due to the strong water absorption and water retention of glue-free gypsum, the putty paste should be dried first after being scraped, but the bottom glue-free gypsum is not dry. In this way, the surface layer of putty paste will crack, peel, and fall off, especially in the thick scraped part of the putty paste. Good quality putty paste has high tension and high hardness and is more likely to crack.
1.5 The bottom layer of glue-free plaster is not dry enough or absorbs water and returns moisture, and it will also cause mold on the wall, which will seriously affect the decorative effect and human health.
2. Technical personnel must pay attention to the following matters when dealing with quality complaints
2.1 Check the condition of the base layer of the wall (the condition of the original base layer, what kind of putty is used, whether the base layer is treated according to the requirements of the product manual, the dryness of the base layer, and the flatness).
2.2 What is the thickness of the wall scraping company's putty paste?
2.3 The cracked part of the putty paste and how much it cracked.
2.4 Analyze the causes of wall problems and identify responsibilities.
2.5 The treatment plan must have a treatment method for the grassroots, and must include the following:
2.5.1 For the glue-free gypsum wall or the wall behind the shovel wall, the interface agent should be brushed after the wall is dry, and the interface agent must be brushed;
2.5.2 The uneven wall and top should be smoothed and dried before the putty paste should be scraped, and the construction should be carried out in strict accordance with the thickness and method required by the product instruction manual;
2.5.3 The interface agent is fully brushed 2-3 times, and then the putty paste is scraped off the closed wall after drying;
2.5.4 For the glue-free gypsum wall, it is best to persuade the customer to completely remove the glue-free gypsum layer, and use the blue star corundum two-component corner fillet with good water resistance and fast drying to repair the uneven base surface or straighten the yin and yang corners to No aftermath.
2.6 Summarize the process and completion of resolving complaints this time, so that you can better deal with similar situations next time. Report the company's product quality problems or various factors that are likely to cause product quality problems to the company in a timely manner to ensure that similar problems can be avoided next time.
Sichuan Jinjiang Industrial Co., Ltd.
August 1, 2013
(Chengdu putty) Blue Star Corundum putty handling quality complaints matters needing attention
[Summary]1. Due to the wide application of glue-free gypsum on the market, there are the following hidden dangers
1.1 This type of product has poor leveling ability in full batches. The wall after glue-free gypsum treatment needs to be filled with thicker or even extra-thick putty during construction, which exceeds that of the putty paste, which is less than 0.5mm per batch, and the total thickness is less than 2mm. requirements (see each product manual).
1.2 This type of product solidifies quickly, but it is not easy to dry. Often, the glue-free gypsum used for wall construction is solidified but not completely dry, and the workers will scrape the putty paste, causing the putty paste to be scraped on the wall or scraped and turned over.
1.3 Even if the glue-free gypsum has dried up, due to its extremely poor water resistance, it is not easy to dry after absorbing water. During the construction of the putty paste, the glue-free gypsum absorbs a large amount of water in the putty paste and returns to a water-retaining, moist and soft state. The surface is subjected to external force by scraping. Friction damage, causing the putty paste to be unable to apply to the wall or scrape the skin.
1.4 Due to the strong water absorption and water retention of glue-free gypsum, the putty paste should be dried first after being scraped, but the bottom glue-free gypsum is not dry. In this way, the surface layer of putty paste will crack, peel, and fall off, especially in the thick scraped part of the putty paste. Good quality putty paste has high tension and high hardness and is more likely to crack.
1.5 The bottom layer of glue-free plaster is not dry enough or absorbs water and returns moisture, and it will also cause mold on the wall, which will seriously affect the decorative effect and human health.
2. Technical personnel must pay attention to the following matters when dealing with quality complaints
2.1 Check the condition of the base layer of the wall (the condition of the original base layer, what kind of putty is used, whether the base layer is treated according to the requirements of the product manual, the dryness of the base layer, and the flatness).
2.2 What is the thickness of the wall scraping company's putty paste?
2.3 The cracked part of the putty paste and how much it cracked.
2.4 Analyze the causes of wall problems and identify responsibilities.
2.5 The treatment plan must have a treatment method for the grassroots, and must include the following:
2.5.1 For the glue-free gypsum wall or the wall behind the shovel wall, the interface agent should be brushed after the wall is dry, and the interface agent must be brushed;
2.5.2 The uneven wall and top should be smoothed and dried before the putty paste should be scraped, and the construction should be carried out in strict accordance with the thickness and method required by the product instruction manual;
2.5.3 The interface agent is fully brushed 2-3 times, and then the putty paste is scraped off the closed wall after drying;
2.5.4 For the glue-free gypsum wall, it is best to persuade the customer to completely remove the glue-free gypsum layer, and use the blue star corundum two-component corner fillet with good water resistance and fast drying to repair the uneven base surface or straighten the yin and yang corners to No aftermath.
2.6 Summarize the process and completion of resolving complaints this time, so that you can better deal with similar situations next time. Report the company's product quality problems or various factors that are likely to cause product quality problems to the company in a timely manner to ensure that similar problems can be avoided next time.
Sichuan Jinjiang Industrial Co., Ltd.
August 1, 2013
- Classification:Company News
- Author:
- Source:
- Release time:2013-08-02
- Visits:0
1. Due to the wide application of glue-free gypsum on the market, there are the following hidden dangers
1.1 This type of product has poor leveling ability in full batches. The wall after glue-free gypsum treatment needs to be filled with thicker or even extra-thick putty during construction, which exceeds that of the putty paste, which is less than 0.5mm per batch, and the total thickness is less than 2mm. requirements (see each product manual).
1.2 This type of product solidifies quickly, but it is not easy to dry. Often, the glue-free gypsum used for wall construction is solidified but not completely dry, and the workers will scrape the putty paste, causing the putty paste to be scraped on the wall or scraped and turned over.
1.3 Even if the glue-free gypsum has dried up, due to its extremely poor water resistance, it is not easy to dry after absorbing water. During the construction of the putty paste, the glue-free gypsum absorbs a large amount of water in the putty paste and returns to a water-retaining, moist and soft state. The surface is subjected to external force by scraping. Friction damage, causing the putty paste to be unable to apply to the wall or scrape the skin.
1.4 Due to the strong water absorption and water retention of glue-free gypsum, the putty paste should be dried first after being scraped, but the bottom glue-free gypsum is not dry. In this way, the surface layer of putty paste will crack, peel, and fall off, especially in the thick scraped part of the putty paste. Good quality putty paste has high tension and high hardness and is more likely to crack.
1.5 The bottom layer of glue-free plaster is not dry enough or absorbs water and returns moisture, and it will also cause mold on the wall, which will seriously affect the decorative effect and human health.
2. Technical personnel must pay attention to the following matters when dealing with quality complaints
2.1 Check the condition of the base layer of the wall (the condition of the original base layer, what kind of putty is used, whether the base layer is treated according to the requirements of the product manual, the dryness of the base layer, and the flatness).
2.2 What is the thickness of the wall scraping company's putty paste?
2.3 The cracked part of the putty paste and how much it cracked.
2.4 Analyze the causes of wall problems and identify responsibilities.
2.5 The treatment plan must have a treatment method for the grassroots, and must include the following:
2.5.1 For the glue-free gypsum wall or the wall behind the shovel wall, the interface agent should be brushed after the wall is dry, and the interface agent must be brushed;
2.5.2 The uneven wall and top should be smoothed and dried before the putty paste should be scraped, and the construction should be carried out in strict accordance with the thickness and method required by the product instruction manual;
2.5.3 The interface agent is fully brushed 2-3 times, and then the putty paste is scraped off the closed wall after drying;
2.5.4 For the glue-free gypsum wall, it is best to persuade the customer to completely remove the glue-free gypsum layer, and use the blue star corundum two-component corner fillet with good water resistance and fast drying to repair the uneven base surface or straighten the yin and yang corners to No aftermath.
2.6 Summarize the process and completion of resolving complaints this time, so that you can better deal with similar situations next time. Report the company's product quality problems or various factors that are likely to cause product quality problems to the company in a timely manner to ensure that similar problems can be avoided next time.
Sichuan Jinjiang Industrial Co., Ltd.
August 1, 2013
Scan the QR code to read on your phone
News
Title:
- Full Moon Mid Autumn Festival 2024-09-14
- Passed the Ten Ring Certification and China Green Product Dual Certification 2024-06-18
- Dragon Boat Festival Health 2024-06-07
- Received the title of "Quality and Integrity Benchmark Enterprise" in the 3.15 event 2024-03-19
- Bamboo Shadow Moon Rhyme Osmanthus Wine, Jade Sea Golden Glory Celebrates Mid Autumn Festival 2023-09-28
- Emphasize emotions and righteousness,, and everything is high' zong ' 2023-06-21
- Quality and Integrity Benchmarking Enterprise" won in the March 15, 2023 event 2023-03-17
- In 2022, the company will once again be awarded the "3.15" Quality and Integrity Demonstration Enterprise 2022-03-21
- Be careful to identify counterfeit blue star corundum products 2022-03-04
- Obtained "National Quality Inspection Stable Qualified Products" 2022-03-01
- The website is fully upgraded and revised 2022-02-24
- Passed the ISO quality and environment dual management system certification again 2022-02-24
- Our company won the "Product Quality Integrity Benchmarking Enterprise" 2022-02-24
- Blue Star Corundum manufacturer Sichuan Jinjiang Industrial Co., Ltd. was invited to participate in the national "Product Quality Law" revision seminar 2019-04-22
- Congratulations to our company for winning the "6 in 1" intellectual property certificate 2019-01-04
- Blue Star Corundum Base Surface System Experience Center of Chengdu International Trade City was grandly opened 2018-11-28
- Congratulations to our company for winning the 2018 [Sichuan Province Quality Inspection Compliance. Customer Satisfaction Enterprise] 2018-09-04
- Our company has successfully passed the international quality and environment dual management system certification 2018-03-07
- Congratulations to our company for winning the 2015 Double Excellent Demonstration Enterprise (Chengdu Putty) 2015-03-20
- Blue Star Corundum wishes all friends a prosperous year of the sheep 2015-02-09
- Mid-autumn festival gathers at home firewood house 2014-09-15
- All employees of Sichuan Jinjiang Industrial Co., Ltd. welcome the Mid-Autumn Festival 2014-09-05
- Notice of the unified name of the leveling putty powder for the interior wall of the filling king 2014-09-04
- Huayang Huayin Meijing Home Improvement Waterproof Project (Chengdu Putty) 2014-05-12
- 2014 Bichunyuan Spring Festival Gala 2014-02-09
- Blue Star Corundum Emei Store's Thousand Yuan Award 2013-09-18
- Sichuan Jinjiang Industry 2013 Mid-Autumn Festival Dinner and Family Carnival (Chengdu Putty) 2013-09-18
- (Chengdu Putty) Blue Star Corundum Chengdu Fuhe Specialty Store in the Thousand Yuan Award 2013-09-18
- Blue Star Corundum Scratch Card has a prize and the first thousand-yuan prize is produced in Mianyang 2013-08-19
- Buy Blue Star Corundum in the thousand yuan prize, the Blue Star Steel Jade Scratch Card has a prize promotion promotion! 2013-08-09
- (Chengdu putty) Blue Star Corundum putty handling quality complaints matters needing attention 2013-08-02
- Colorful June 1, Chengdu Putty Blue Star Corundum Base Surface System is a gift 2013-05-31
- Yinrong Garden 2012 Annual Conference and Chinese New Year Party 2013-02-03
- New Year's Day: Ten Thousand Volumes of the Year of the Snake Hard Shell Notebook Issued 2012-12-29
- Huayang Base Surface Treatment System Experience Center Tender Notice 2012-12-11
- Full of love in Jinjiang, Xinghua Village gathers for a special Mid-Autumn Festival dinner 2012-09-29
- Blue Star Corundum East Gate Foundation Surface Treatment System Experience Center opened 2012-09-05
- Visual feast: DM sheet of elastic waterproof coating officially released 2012-02-25
- The new product Blue Star Corundum elastic waterproof coating is grandly launched 2012-02-10
- Gathered in New Imperial City for 2011 Annual Conference 2012-02-02
- Happy New Year to you! 2011-12-31
- The new hard shell notebook for the Year of the Dragon is released 2011-12-30
- Blue Star Corundum anti-counterfeiting technology has been upgraded 2011-10-28
- All employees of the Mid-Autumn Festival reunite in Yinrong Garden 2011-09-14
- Sichuan market product quality integrity enterprise 2011-09-13
- Blue Star Corundum Announcement to Clients 2011-05-19
- The dealer conference of Sichuan Jinjiang Industrial Co., Ltd. was successfully held 2011-04-29
- Jinjiang Industrial website is newly revised, welcome to visit 2010-11-22
- New Year's Day: Ten Thousand Volumes of the Year of the Snake Hard Shell Notebook Issued 2009-12-01
Factory Address: No. 166 Dayang Road, Shuangliu Park, Jiaolong Industrial Port, Chengdu
Tel: +86-028-85739619 +86-400-660-0005
©Sichuan Jinjiang Industrial Co., Ltd. 蜀ICP备05014603号
Powered by www.300.cn